Home Generator Installation
Generator Installation, Done Right the First Time.
One crew from sizing to start-up. One real price in writing. Tested under full load before we leave your driveway.

How our install works.
Five steps. No surprises. You will know what is happening at every one.
- 1
Free sizing visit
We measure what your home actually needs.
- 2
Fair written estimate
Pad, permit, and hookup included.
- 3
Professional install
Level pad, properly sized gas line, clean electrical tie-in.
- 4
Full-load test while you watch
We kill the main breaker and your generator carries the house before we pack a single tool.
- 5
Walkthrough and warranty registration
We show you how it runs and file the paperwork for you.

What cheap estimates hide.
A low number on day one often turns into a much bigger bill on install day. The same four items show up as add-ons again and again.
- The concrete pad billed later as an extra
- The permit fee added at the end
- The gas hookup estimated by a separate company
- Haul-away of the old equipment as a surprise line item
Our estimate has one real number. The pad, permit, gas hookup, cranking battery, and haul-away are already in it.
Common questions, plain answers.
The things folks ask us most before they sign a estimate.
Ten minutes. A fair number in writing. Zero pressure.
Tell us a little about your home. We will come out, size it right, and put a real price on paper.
